2 x Frame 9E gas turbine sets + Steam turbine sets (Gas-Steam Combined Cycle Unit)
Commissioned in 2004
Total power output : 360MW ( 2 x 180MW (GT120 MW + ST 60MW))
Cycle : 50 Hz
Fuel : Natural Gas
Voltage : 13,8KV and 10,5KV
RPM : 3000
Total operating hours : 36547 and 32581 hours
Total number of starts: 2336 and 2005
Overhauled and upgraded in 2010 and 2016/2017
Location: Zhongshan, China.
2 x Frame 9E gas turbine sets + Steam turbine sets (Gas-Steam Combined Cycle Unit)
Commissioned in 2004
Total power output : 360MW ( 2 x 180MW (GT120 MW + ST 60MW))
Cycle : 50 Hz
Fuel : Natural Gas
Voltage : 13,8KV and 10,5KV
RPM : 3000
Total operating hours : 36547 and 32581 hours
Total number of starts: 2336 and 2005
Overhauled and upgraded in 2010 and 2016/2017
Location: Zhongshan, China.