Sarens Cc2800 1 Helps Revamp The Lng Plant In Algeria
Movement and lifts in a live petrochemical site with space constraint involves meticulous planning and Sarens was asked by their client Renaissance for Airproduct to execute heavy lifts and installation of refinery equipment at the LNG plant in Arzew Algeria. Sarens had to lift the Coldbox lox tank lin tanks and other equipment. The most important component was the 47m long cold box weighing 150T. The team decided to deploy the CC2800-1 with SSL 7...